KLAIPEDA, LITHUANIA

KLAIPEDA QUOTE ILLUSTRATION

The client

  • 350,000 PE (people equivalent)
  • Located on the Baltic Sea, next to UNESCO World Heritage Site
  • Main Lithuanian seaport, 3rd largest city in the country
  • The plant was near its maximum capacity and over the past 2 years, the effluent quality was extremely close to the permit of 10 mg/l tot-N.
     

The challenges

  • Klaipedos Vanduo aimed to reduce operational costs (OPEX) and improve effluent performance.
  • They wanted to increase WWTP operations during wet weather situations.
  • To reduce risks, they sought a company with a Performance Guarantee Contract to ensure expected results are achieved.

The solution

  • In 2019, Klaipėdos Vanduo awarded a contract to Hubgrade for real-time optimization of process performance at the Klaipėda WWTP.
  • Hubgrade Wastewater Plant Performance has digital optimization expertise in various fields, including wastewater treatment and real-time optimization.
  • The implementation of Hubgrade Wastewater Performance Plant (HWP) resulted in the following benefits:
    • Ensured compliant effluent despite increased BOD/TN loading.
    • Reduced environmental impact by reducing tot-N in the effluent.
    • Significantly reduced operational expenses for energy and chemical consumption.
    • Significantly reduced the Carbon Footprint of the utility.

 

Innovative digital solutions, like Hubgrade Performance, are a sustainable, cost-effective way for us to continuously improve our WWTP operational processes. An intelligent use of real-time data from our entire system reduced our operational expenses and effluent concentrations.

Kristina Bereišienė, Head of Wastewater Treatment Service

KEY FIGURES

  • M3 treated per day: 432,000
  • 180k€ saved per year on energy and external carbon dosing
  • 2180T CO2-eq saved per year on electricity, external carbon, transportation, and effluent charge
  • 14% reduction of Total-N in effluent