2 process lines with 2 process tanks in each line - total volume : 36,000m3
6 secondary clarifiers - total surface area : 9,225m2
The challenges
Increased plant load over several years, leading to non-compliance with EU effluent standards.
20% increase in plant load expected over the next 5 years.
To address this, Waterschap Vallei en Veluwe had to either extend the plant by a third process line or find another way to optimize capacity and increase treatment efficiency.
The solution
To avoid or postpone a costly extension of the plant, the WWTP implemented an online control system for optimizing biological treatment capacity.
The system is a holistic and data-driven digital solution called Hubgrade Wastewater Plant Performance.
Hubgrade provides real-time optimization of process efficiency and replaced the former PLC-based online control
The system offers a global overview in a web-browser user interface.
The implementation of Hubgrade Wastewater Performance Plant (HWP) resulted in the following benefits: