 [     Events listing ](/en/newsroom/events "  Events listing")

 27 - 29 January 2026 

  + Add to my calendar   Close    - [iCal calendar](https://www.veoliawatertechnologies.com/en/event/calendar/ical/12756/calendar.ics)
- [Outlook calendar](https://www.veoliawatertechnologies.com/en/event/calendar/ical/12756/calendar.ics)
- [Google calendar](https://www.google.com/calendar/event?action=TEMPLATE&dates=20260127/20260130&text=2nd%20Annual%20Excellence%20in%20Data%20Center%20Construction%2C%20Design%2C%20and%20Engineering%20Forum&details=Construction%2C%20Design%2C%20and%20Engineering%20Forum&trp=TRUE&sprop=https%3A//www.veoliawatertechnologies.com/en/newsroom/events/2nd-annual-excellence-data-center-construction-design-and-engineering-forum)
- [Yahoo! calendar](https://calendar.yahoo.com?v=60&title=2nd%20Annual%20Excellence%20in%20Data%20Center%20Construction%2C%20Design%2C%20and%20Engineering%20Forum&desc=Construction%2C%20Design%2C%20and%20Engineering%20Forum&url=https%3A//www.veoliawatertechnologies.com/en/newsroom/events/2nd-annual-excellence-data-center-construction-design-and-engineering-forum&st=20260127&et=20260129)
 
 





 

 

 

 

 

 



### Dates: 26-29 January

### Location: Washington DC, USA

Premier U.S. event bringing together industry leaders to address next-generation data center challenges and opportunities. The forum showcases cutting-edge innovations, best practices, and emerging trends through experts presentations, panel discussions, and case studies. Attendees benefit from valuable insights ans exceptional networking opportunities with data center operators, cloud providers, construction firms, and technology experts.



 

 

 



 

 

    [More information here](https://tbmgroup.eu/etn/2nd-annual-excellence-in-data-center-construction-design-and-engineering-forum/)