Design & Build - Wastewater treatment - Flow rate: 126 m3/h - Maximum inlet flow: 2 x 60 m3/h - Commissioning year: 2005
London Power Company – UK
Wastewater treatment
Project Background
The Client’s Needs
- Wastewater treatment
Project & Technology Solutions
Flue Gas Treatment- Remove the residual gypsum from the wastewater which is supersaturated with gypsum.
- Reduce the heavy metal content in the wastewater.
Wastewater treatment from 4 FGD units.
- The plant is constructed by materials selected to handle high corrosive chloride-concentrations.
- Polymer and lime dosing systems.
- Desaturation, precipitation, coagulation, flocculation, sedimentation and lamellar settling.
Sludge dewatering
Services
- Supply of chemicals.
- Plant design, installation and testing.