Mobile Water Services assists INEOS ChlorVinyls with Cooling Tower maintenance, UK


Chemicals

The Client's Needs
 

Ineos Mobile Water
INEOS ChlorVinyls is a major manufacturer of industrial chlor-alkali chemicals. A global leader in chlorine derivatives and Europe’s largest PVC ...

INEOS ChlorVinyls’ wooden cooling towers were to be replaced but shutting down the cooling system would result in lost production, so the towers were to be replaced one at a time. In order to complete the on-line change 50m3/hr of cooling water, contaminated with demolition debris, flowing into the sump of the off-line tower had to be handled and treated. Commissioning Manager Eddie Sloane considered his options: discharge the water to drain or recover it back to the cooling system. The first option would overload the drains, and replacing the lost water with mains water would be expensive and would exceed the capacity of the cooling system make-up water treatment plant. The second option needed a pumping and filtration system to remove the demolition debris.

 

The Solution


Mobile Water Services could provide a temporary plant consisting of pumps and two stages of filtration: coarse strainers followed by bag filters. The skid mounted plant was designed, built and delivered to site within only a few days. The bespoke system remained there for two months until the tower replacement had been completed. Removing the debris from the water and retaining it, and the cooling water conditioning chemicals that it contained, was not only a more environmentally friendly solution but also allowed continued operation of the cooling system at full duty. The cost saving of disposing of the contaminated water and replacing it with mains, Mobile Water Services saved the client £30,000.
 

The Benefits

  • Process Capacity: a continuous supply of 50m3/h
  • Rapid Response: Onsite within days of inquiry
  • Environmental Impact: Prevented discharge of contaminated water
  • To Budget: project resulted in £30,000 cost saving to the client
     

Key Facts
 

INEOS ChlorVinyls’ manufacturing process depends on cooling system

Key Facts
 

Cooling system had to remain operational during replacement of cooling towers

Key Facts
 

INEOS ChlorVinyls’ industrial customers depend on supplies